Day 134, 11 March 2013

The ground has thawed and there was a lot of digging and surface leveling going on today. 
This was the point at which i could no longer watch. Fortunately, the crew was especially careful, and the driver especially skillful, so that last little spit of land at the southern end of the site was cleared to the same level as the rest of the work area.

PS. Thanks to the crew for moving the dumpsters to a more accessible location. 